AT OSBORNE FORESHORE ESTATE, PHASE 2, IKOYI, LAGOS
Niyod Construction just concluded the production and installation of 30 Nos. 350mm x 350mm pre-cast concrete driven piles to an average depth of 44m at OSBORNE FORESHORE ESTATE PHASE 2, IKOYI, LAGOS
The Structural Engineers are ECON INTERNATIONAL LTD.
The Architects are PIEACH LTD. JANUARY 2016